Prepare for installation
-
Unpacking the appliance
-
Preparing the site and rack
-
Electrical safety precautions
Unpack the appliance
-
Ethernet cables for each additional Ethernet port that you connect to your network
-
One available Ethernet port on your network switch or hub for each NetScaler Ethernet port you want to connect to your network Note: Transceiver modules are sold separately. Contact your NetScaler sales representative to order transceiver modules for your appliance. Only transceivers supplied by Citrix are supported on the appliance.
-
A computer to serve as a management workstation
Prepare the site and rack
Site requirements
-
Environment control
An air conditioner, preferably a dedicated computer room air conditioner (CRAC), capable of maintaining the cabinet or server room at a temperature of no more than 27 degrees C/80.6 degrees F at altitudes of up to 2100 m/7000 ft, or 18 degrees C/64.4 degrees F at higher altitudes, a humidity level no greater than 45 percent, and a dust-free environment.
-
Power density
Wiring capable of handling at least 4000 watts per rack unit in addition to power needs for the CRAC.
Rack requirements
-
Rack characteristics
-
Power connections
-
Network connections
-
Space requirements
-
Compact 4-post rail kit, which fits racks of 23–33 inches.
-
2-post rail kit, which fits 2-post racks.